facultystaff:ugraddir:ta_allocations
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
facultystaff:ugraddir:ta_allocations [2016/11/09 13:28] – [TA Allocations] judi | facultystaff:ugraddir:ta_allocations [2016/11/09 13:38] (current) – [TA Allocations] judi | ||
---|---|---|---|
Line 5: | Line 5: | ||
The formula uses some base values of time-to-complete for the common tasks for teaching assistants. The base values came from discussions with present and past teaching assistants about task duration. | The formula uses some base values of time-to-complete for the common tasks for teaching assistants. The base values came from discussions with present and past teaching assistants about task duration. | ||
- | It is worth noting that the formula does not consider drop rates or the fact that often students simply don't submit an assignment. This is intentional as it allows for extra time for things that take longer | + | |
+ | The formula does not consider drop rates or the fact that often students simply don't submit an assignment, meaning that the formula actually provides more time per TA activity | ||
==== Default Time Estimates for Common TA tasks ==== | ==== Default Time Estimates for Common TA tasks ==== | ||
facultystaff/ugraddir/ta_allocations.1478698118.txt.gz · Last modified: 2016/11/09 13:28 by judi