planning:reynolds_move_and_reno_wrap-up
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
planning:reynolds_move_and_reno_wrap-up [2018/08/22 15:22] – zweepl | planning:reynolds_move_and_reno_wrap-up [2018/08/22 15:31] (current) – zweepl | ||
---|---|---|---|
Line 16: | Line 16: | ||
* Create posters for REYN and THRN about central login switch-over (Dana) | * Create posters for REYN and THRN about central login switch-over (Dana) | ||
* Currently, there are no projectors in THRN 2418. Make sure that CTS finishes projector install in THRN 2418, need instructions to pass to TA's and instructors. 23rd and 24th, monitor the situation. Dave Loates is the contact for this. | * Currently, there are no projectors in THRN 2418. Make sure that CTS finishes projector install in THRN 2418, need instructions to pass to TA's and instructors. 23rd and 24th, monitor the situation. Dave Loates is the contact for this. | ||
+ | * Keys from locksmith. Make sure Sarah remembers. | ||
Decisions: | Decisions: |
planning/reynolds_move_and_reno_wrap-up.1534951344.txt.gz · Last modified: 2018/08/22 15:22 by zweepl