The projection equipment in THRN 3401 is now 12 years old, having been installed when the lab was set up in 2011.
This equipment is now beyond end of life and has begun to fail.
CTS was called to assess and repair. They managed to find a replacement bulb, and to remove the switching equipment to increase reliability, with VGA connections being disabled
Replacement of this equipment should be investigated for S23